Call(WhatsApp Us)
+8615360806100Email Us
cherry@laeyo.comSee the factory by live video walkthrough
Book an on-site factory visit in Guangzhou
Retinol Correxion Under Eye Cream is specially designed for the delicate skin around the eyes. Its fine and smooth texture is easily absorbed without feeling heavy. It helps improve dark circles and puffiness, smooths the skin texture around the eyes, and leaves the eye area looking brighter, firmer, and more refreshed. Suitable for daily eye care use.
From fast sampling to iterative optimization—aligned to your market and positioning.
Stable production workflow with quality checkpoints for consistency and scale-up.
Packaging options, decoration, labeling/INCI coordination—helping you launch shelf-ready SKUs.
Add packaging options (one per line) in B2B Landing.
Add decoration options (one per line) in B2B Landing.
Micro / stability / compatibility (as needed) with production QC checkpoints.
INCI list, COA, SDS/MSDS, GMP/ISO certificates (scope-dependent).
Label guidance and documentation packaging support based on target market expectations.
At LAEYO Labs, we quote eye cream private label by six cost blocks: formula base and actives, jar or airless pack, decoration and tooling, filling and assembly, testing and documents, and freight. Formula-first matters: we select the container after the cream viscosity, fill temperature, and preservative system are set, then validate the combo before mass production. MOQ is driven by pack type and decoration. Stock acrylic jars or airless bottles often start at 3,000-5,000 pcs per SKU; custom molds or multi-color decoration usually need 10,000+ pcs to absorb tooling. Sampling is typically 7-15 working days after formula brief, benchmark samples, and pack selection, excluding courier. Tooling and decoration samples add about 25-35 days. Bulk lead time is usually 30-45 days after formula, pack, artwork, and deposit approvals. For the Middle East, plan stability, microbial, COA, MSDS, and PAO documentation early; we can support testing and dossier preparation but do not guarantee regulatory approval. Lock a Golden Packaging sample before repeat orders to control label bubbling, pump torque, and leakage in humid or air-freight conditions.
For hydrogel eye patches in the Middle East, bulk cost is driven less by the patch itself than by fill weight, hydrogel thickness, active blend, and barrier packaging. Typical MOQ is 10,000-20,000 pairs per SKU; lower runs are possible with higher unit cost and longer scheduling. We quote against your target retail price, pouch or jar format, and carton configuration, so send packaging direction early. Sampling usually takes 7-10 working days after formula and artwork freeze, plus courier time. We can support microbial, stability, and skin irritation testing and provide COA, MSDS, GMP/ISO documents; product registration and claims remain your responsibility. For Middle East heat and humidity, foil sachets or sealed jars reduce drying and label lift; we run seal-strength and leak checks before bulk. Production lead time is commonly 25-35 days after sample approval and deposit, then sea or air freight. Confirm Arabic labeling, barcode, and any market-specific document needs at RFQ to avoid rework. Bulk cost analysis should compare landed cost, not just FOB unit price.
Start with the formula and rollerball system together: viscosity, fill temperature, ball seat tolerance, and fitment torque decide leakage risk more than the bottle alone. For Middle East sea freight, heat and pressure changes can push product through the ball or thread, so we validate the exact bottle, ball, and cap as a Golden Packaging set before bulk. Typical sampling is 7-12 working days after artwork and components are confirmed; stability and compatibility checks run in parallel where possible. Use a leak test after filling, a torque check on the collar, and a temperature-cycling or transport simulation that reflects summer container conditions. Ask for headspace control, a tight liner or seal, and secondary packaging that absorbs vibration. MOQ usually follows component tooling and filling line setup: stock rollerball packs can start lower, while custom ball diameters or decorated bottles raise MOQ. Sea freight requires a confirmed pack-out and drop/leak check before booking; production lead time is typically 25-35 days after sample approval and deposit, plus freight. We can support documentation and testing for your market, but final regulatory clearance remains with your brand. Keep the approved Golden Packaging as the locked reference for repeat orders.
To calculate natural origin eye cream percentages, first agree the basis: botanical extract inclusion level by formula mass, or natural origin content under ISO 16128. We prepare a mass-balance sheet for each raw material, collect supplier COA, INCI, origin declaration and natural origin index, then reconcile the finished formula. This lets you quote a defensible percentage without overstating the botanical story. For verification, we can support a documentation pack: raw-material traceability, allergen statement, MSDS, natural origin calculation sheet, batch records, microbial and preservative efficacy testing, stability and packaging compatibility. For Middle East launches, heat and humidity are material; we can run accelerated stability and monitor jar, tube and airless pump leakage and label adhesion. We can support testing and documentation, but registration approval remains with your local RA. Commercially, plan on 3,000-5,000 units per SKU for eye cream, depending on jar or tube and decoration. Sampling is usually 10-15 working days after a clear brief and base selection. Production lead time is typically 25-35 working days after sample approval and PO, plus testing time. Share target market, claims, packaging direction and launch date so we can confirm feasibility and quote correctly.
Start with the primary eye-care pack: confirm tube or bottle dimensions, dropper or pump height, leaflet fold, and carton insertion force before artwork. For premium foil stamping, use 300-350gsm SBS or duplex board, matte lamination, and one or two foil colors; keep foil coverage moderate and avoid deep multi-level emboss on first launch because it raises tooling cost and scuff risk. MOQ is usually 3,000-5,000 cartons per SKU and design for custom foil; stock board and standard foil can be quoted lower. Sampling: dieline and digital proof 3-5 working days, physical white sample 7-10 days, foil proof 10-14 days, with two revision rounds. We support artwork checks, barcode, batch and PAO fields, and GCC labeling documents; regulatory approval remains yours. For Dubai humidity and sea freight, specify moisture-resistant cartons, silica, and pallet wrap; foil edges can lift if board moisture is high. Production lead time is 20-30 days after proof approval, plus freight. Lock a Golden Packaging sample before repeat orders.
Tacky after-feel in an eye gel is almost always a rheology problem, not a dosage problem. Under-neutralized carbomer leaves a film that never sets; over-neutralized gel balls up under the eye. We fix the spec before scale-up: polymer type, neutralizer ratio, target viscosity at 25C with spindle and RPM written into the batch record, plus a pH window so the gel stays clear in Gulf heat. Hydration is the second control point. Record pre-dispersion medium, powder addition rate, water temperature and hold time; unhydrated particles form fish eyes that smear as sticky lumps. Fill temperature must sit inside a narrow window, or the gel sets unevenly in the tube and dispenses stringy. For Middle East launches we typically quote 3,000-5,000 units MOQ, 10-14 days sampling, and stability at 45C for three months plus freeze-thaw cycles to cover air freight pressure. We supply COA, MSDS, GMP and ISO records to support your SASO or Gulf notification; we can support documentation and testing but do not guarantee approval outcomes. Packaging can be airless pump or single-dose vials, and production runs 30-35 days after sample sign-off.
Natural does not mean non-irritating. Essential oils are complex mixtures that can contain fragrance allergens and restricted materials, so we screen the full component list against your target market rules before sampling, not after. For eye-area lotions we treat eye irritation as a foreseeable exposure scenario, not a label disclaimer. Formulations with high surfactant load, extreme pH, volatile solvents or menthol-type coolants get a higher review tier. We can support irritation assessment using in-vitro strategies such as OECD TG 467 defined approaches, plus microbial and stability data. Practical path: send your formula direction or benchmark; feasibility runs in 5-7 working days. Sampling is typically 10-15 working days, plus 25-35 days for eye-irritation related testing depending on the protocol selected. MOQ for eye lotion is commonly 3,000-5,000 units per SKU, driven by filler minimums and airless or tube component order quantities. Packaging matters: on airless pumps and dropper bottles we check pump torque variance and drop size, and we run leakage checks that simulate air-freight pressure changes. Middle East shipments in summer also need heat-cycle stability data. We provide documentation to support your registration; approval decisions remain with your local authority.
For Middle East eye care launches, treat lead time as a chain of gates, not one date. Start 8-10 weeks before your target ship date: confirm formula and claims, approve artwork, and reserve filling capacity. For faster launches, use stock airless bottles, tubes or jars with MOQ 3,000-5,000 pcs per SKU; custom molds or special applicators usually push MOQ to 10,000+ and add 15-25 days tooling and component lead time. Sampling for an existing base is about 7-10 working days; new eye serums or creams need 10-15 days plus stability and preservative-efficacy review. We can arrange eye-irritation-relevant testing and provide COA, MSDS, GMP/ISO22716, stability protocol and microbiological reports to support your registration, but approval remains with your market authority. Pilot run 3-5 working days, then bulk production typically 25-35 days after PO, deposit and approved sample. Add 5-7 days for QC release and docs, and 20-35 days sea freight to Middle East ports. During peak season, pre-book components and avoid last-minute label changes. Watch dropper torque, pump dose consistency, and label bubbling in humid conditions; these are common rework points.