Call(WhatsApp Us)
+8618988990383Email Us
postmaster@laeyolabs.com广州市花都区花山镇华辉路18号
微观化妆品创意产业园E栋整栋Reliable sunscreen spray performance depends as much on the valve and actuator system as on the formulation itself. For sourcing teams and brand owners, understanding key packaging controls helps prevent leaky, inconsistent, or noncompliant…
Reliable sunscreen spray performance depends as much on the valve and actuator system as on the formulation itself. For sourcing teams and brand owners, understanding key packaging controls helps prevent leaky, inconsistent, or noncompliant sprays—problems that can derail launches or trigger costly rework. The following checklist outlines what to verify before you sign off on a sunscreen spray pack.
| Area | Test / Document | Evidence to Request | Expected Outcome |
|---|---|---|---|
| Valve | Compatibility test 40°C, 4 weeks | Lab report from packaging engineer | No corrosion, smooth flow |
| Actuator | Spray pattern / output rate | Supplier QC data + photos | Uniform mist, target output ±10% |
| Can integrity | Pressure burst test | Certified test record | Complies with regional aerosol safety limits |
| Seal leakage | Weight change study | Stability test result summary | No visible leak, <0.5% mass loss |
Request the supplier’s pressure test certificate, valve spec sheets, and batch QC records. These verify compliance with applicable transport and cosmetic packaging regulations.
Conduct a 10-spray deposition test onto absorbent paper to visualize pattern consistency. Compare to reference samples from the approved batch.
Rapid temperature or pressure changes can expand propellant, stressing valves or seals. Confirm crimp torque, gasket material, and can wall thickness match specifications, and use temperature-controlled transport.
Only if the formulation chemistry and propellant systems are compatible. Always run cross-compatibility and stability verification before reusing components.
At least once every 12 months or whenever a raw material, valve supplier, or fill line changes. Document each requalification as part of your technical file.
Request a Quote to secure compliant, tested sunscreen spray packaging aligned with your production timeline and market standards.