Quick Answer (for busy buyers)
Here’s the buyer-first summary. If your brand name is on the label, you usually act as the responsible person and must ensure the listing is submitted and kept current.
- From your brief to a golden sample, we typically move through: scientific product selection, proposal confirmation, then lab proofing and sample confirmation.
- If you want a customized formula, we can develop and make samples, then iterate based on texture, scent, and performance feedback.
- A realistic sampling timeline is driven by production-and-test steps: raw material production takes about 5-7 working days, raw material testing about 5 working days, and finished product production about 7 working days (roughly 17-19 working days total).
- If packaging testing is required, allow about 3 more days.
- Packaging often becomes the longest pole if you need “as-sold” packaging for the golden sample: packaging orders can take 10-30 working days (e.g., glass bottle 15, acrylic bottle 30, single box 15, set box 20).
- MOQ is generally 1,000-3,000 units (simpler items can start at 1,000; complex skincare sets are usually 3,000).
- For mass production, bulk lead time is commonly 10-20 working days after all specs are locked.
- We can support documentation, barcodes, and arrange inspection/testing, but cannot guarantee regulatory outcomes.
Buyer outcome
A launch-ready compliance plan: inputs collected, roles assigned, and update cadence defined.
Most common blocker
Missing facility information + inconsistent ingredient/label snapshots across SKUs.
⚠️
This page is a practical buyer guide. For definitive requirements and updates, use FDA resources and qualified regulatory counsel.