Quick Answer (for busy buyers)
Here’s the buyer-first summary. If your brand name is on the label, you usually act as the responsible person and must ensure the listing is submitted and kept current.
- For U.S. lip care manufacturing, our QC checkpoints start with raw material verification including microbial testing and pigment dispersion analysis.
- During production, we verify viscosity at 25°C±2°C and fill weight accuracy within ±2% tolerance.
- Packaging integrity checks include pump torque verification and leakage testing under simulated air freight pressure.
- MOQ starts at 5,000 units per SKU with sampling taking 10-14 days.
- We provide full documentation including COA, stability reports, and FDA registration support.
- Lead time for production is typically 45-60 days after final approval.
Buyer outcome
A launch-ready compliance plan: inputs collected, roles assigned, and update cadence defined.
Most common blocker
Missing facility information + inconsistent ingredient/label snapshots across SKUs.
⚠️
This page is a practical buyer guide. For definitive requirements and updates, use FDA resources and qualified regulatory counsel.