Quick Answer (for busy buyers)
Here’s the buyer-first summary. If your brand name is on the label, you usually act as the responsible person and must ensure the listing is submitted and kept current.
- For LAEYO Labs, most items start at 1000-3000 units per SKU.
- A 300-500 unit pilot is usually blocked by factory MOQ and by packaging suppliers’ minimums, especially for glass bottles, pumps, and decorated components.
- The most practical path is to finalize the concept and formula with samples first, then launch with 1000 units on a hero SKU (or consolidate multiple SKUs into one shared bottle/box structure).
- Typical workflow is: scientific product selection -> proposal confirmation -> contract -> brand/pack design -> sample confirmation -> production -> shipment.
- We can support customized formula development and lab sampling, plus product architecture, instructions, and price list copy if you need it.
- Timing is mainly driven by packaging and testing.
- Packaging ordering often takes 10-30 working days (e.g., glass bottle about 15 days; acrylic can be 30 days).
- Bulk production lead time is commonly 10-20 working days after final sample approval.
- We can arrange product testing and track test reports, and provide documentation support (e.g., required certificates and barcode information) while avoiding any guarantee of U.S. regulatory approval.
Buyer outcome
A launch-ready compliance plan: inputs collected, roles assigned, and update cadence defined.
Most common blocker
Missing facility information + inconsistent ingredient/label snapshots across SKUs.
⚠️
This page is a practical buyer guide. For definitive requirements and updates, use FDA resources and qualified regulatory counsel.
