Call(WhatsApp Us)
+8615360806100Email Us
cherry@laeyo.comTake a Live Video Tour of Our Factory
Book an on-site factory visit in Guangzhou
Premium OEM/ODM Shampoo & Conditioner Gift Set for Curly, Dry & Damaged Hair
From fast sampling to iterative optimization—aligned to your market and positioning.
Stable production workflow with quality checkpoints for consistency and scale-up.
Packaging options, decoration, labeling/INCI coordination—helping you launch shelf-ready SKUs.
curly hair, dry hair, damaged hair, split ends, frizzy hair
deep repair, anti breakage, nourish and strengthen, smooth and shine, promote healthy growth
Adults with curly, dry, damaged or frizz-prone hair
Assessment of formula performance over time
Ensure safety and compliance with hygiene standards
Confirm formula and container performance compatibility
Plan shelf life before you lock packaging. For private label hair masks, set a target unopened shelf life such as 24-30 months and a PAO of 6-12 months, then confirm both with accelerated stability, real-time data, microbial challenge, and pack-compatibility testing. We can support protocols, testing coordination, and documentation; final regulatory and claim decisions remain with your brand. Typical MOQ is 3,000-5,000 pcs per SKU per batch; stock formula and stock pack can reduce this. Sampling takes about 10-15 business days after a complete brief. For Middle East heat and humidity, validate label adhesive, jar or tube sealing, and leak risk in transit; request 45C+ warehouse simulation and humidity checks. Use batch codes with production and expiry dates, PAO on pack, and FEFO rotation at your warehouse and Amazon. Keep stock below 30C, out of direct sun, and avoid long FBA storage. Production lead time is usually 25-35 days after sample approval plus packaging and sea freight, so book capacity 90-120 days before launch.
For GCC hair care, start with one hero SKU, usually an oil or serum for shine or a scalp serum, then expand into a routine after sell-through data. A 4-6 SKU routine multiplies MOQ, artwork, testing and working capital before you validate demand. At LAEYO Labs, typical MOQ for a serum is 3,000-5,000 units per SKU; tubes or jars can be lower, but pumps and custom decoration raise MOQ. Sampling takes about 10-15 business days after brief and formula selection, including viscosity, fill temperature and pump torque checks. We support stability, microbial and packaging compatibility testing, plus documentation for GCC notifications; we do not guarantee regulatory approval. Allow 30-45 days production after sample and artwork approval, plus 25-35 days sea freight to GCC; air freight is faster but pressure changes can cause leakage, so we run leakage and label adhesion checks. Hero-first also simplifies claims: one proven formula, one packaging set, one document pack. Add conditioner, mask or leave-in only when repeat purchase and logistics are stable.
Fragrance-free does not mean odorless: surfactants, preservatives, and conditioning agents can leave a base note. Start with raw-material odor screening and a base-only pilot, then evaluate at target pH, viscosity, and fill temperature because neutralization and cooling shift odor. We panel samples at 25C and 40C and review 4-8 week accelerated stability before locking the formula. For sampling, plan 10-15 business days for the first base trial and typically two rounds to align odor, foam, and after-feel. MOQ for a standard 300-500 ml bottle is usually 3,000-5,000 units per SKU; lab and pilot batches stay smaller. We can support microbial challenge, pH, viscosity, and safety documentation, but US regulatory approval and claims remain the brand's responsibility. Packaging matters: liner, headspace, and pump materials can absorb or add odor. Run compatibility with your bottle, cap, and pump before production. After approval, bulk lead time is about 25-35 days depending on components and testing. Share your target market, claims, and pack direction so we quote accurately.
To keep a private label hair oil light across fine, wavy and coily textures, we build the base around dry-touch esters and lightweight emollients, then set the target feel at 1-2 drops per use so fine hair does not collapse. Sampling starts with a 7-10 day bench round; expect 2-3 iterations to tune spreadability, absorption and shine without a greasy film. We run 4-12 weeks of stability at 40C/75% RH plus micro challenge testing before pilot. MOQ is typically 1,000 units per SKU in stock packaging and 3,000+ for custom bottles or printed cartons; a 30ml oil pump improves dose control and reduces over-application complaints. Production lead time runs about 25-35 days after written sample approval, plus packaging lead time, and we plan air freight with pressure-rated secondary packaging to limit leakage. For the US market you remain the responsible party; we support documentation including ingredient statements, safety substantiation input, batch COAs, GMP evidence and stability summaries for your review. Fill temperature and pump torque are verified at line start, and retain samples are held for reference.
To ensure batch-to-batch fragrance consistency for EU hair care orders, we implement a multi-step quality control protocol. First, we source fragrance oils only from certified suppliers who provide IFRA and REACH-compliant materials. Each fragrance batch undergoes GC-MS analysis to compare against a reference standard, ensuring chemical composition matches. This is documented in a Certificate of Analysis for each production run. For production, we standardize mixing parameters such as temperature and agitation speed to minimize variation. We also conduct sensory evaluations by trained panels to check for olfactory consistency. MOQ guidance: to maintain consistency, we recommend an MOQ of 15,000 units per SKU, which allows for optimized batch sizes and reduces cross-contamination risks. Sampling timeline includes a lab sample phase (1-2 weeks for formula development) and pre-production samples (2-3 weeks for fragrance approval). Testing involves stability studies under different conditions to ensure scent longevity. Packaging considerations include using UV-protective materials to prevent fragrance degradation during storage. Lead time from order confirmation to shipment is typically 10-12 weeks, factoring in raw material procurement, production scheduling, and mandatory QA holds for microbial and compatibility tests. We assist with documentation like Technical Information Files and support necessary testing for EU compliance, but clients must verify final regulatory status with their legal teams.
European buyers should audit raw material verification,viscosity during mixing,and microbial checks at production stages.For filling,monitor fill volume,cap torque,and leak tests to prevent defects.MOQ guidance starts at 5000 units per SKU,influencing cost.Sampling timeline takes 2-4 weeks for lab and approval samples.Essential tests include preservative efficacy,heavy metals,and stability studies for EU regulations.Packaging must be EU-compliant with proper labeling.Lead time is 8-12 weeks from order to shipment.We assist with documents like PIF and safety reports to meet regulatory requirements.
Formulating a hair mask for the EU that is rich yet rinses clean involves selecting ingredients like cationic conditioners and silicones in controlled ratios to avoid buildup. We optimize viscosity and use rinsing aids such as gentle surfactants. Key steps include stability testing, microbial checks, and performance assessments to meet EU regulations like REACH and Cosmetics Regulation (EC) No 1223/2009. As an OEM/ODM, we support with documentation such as PIF and CPSR, but cannot guarantee approval; we assist with testing and compliance. For production, MOQ typically starts at 10,000 units per SKU, driven by raw material batches. Sampling takes 4-6 weeks for formula and packaging approval, including leakage tests. Production lead time is 8-12 weeks post-approval, with QA checkpoints for fill weight, label adhesion, and packaging integrity. Provide target ingredients, claims, and packaging direction for an accurate quote.
Formulating a sulfate-free shampoo that cleans well and foams in hard water requires replacing sulfates with gentle surfactants such as sodium lauryl glucose carboxylate or glucosides, and incorporating chelating agents like EDTA to counteract mineral ions. We optimize viscosity and pH through lab trials for stability and performance. For OEM projects, MOQ typically starts at 1000 units to balance batch costs, with sampling taking 2-3 weeks for initial prototypes including foam and compatibility tests. We conduct essential testing like microbial checks, 3-month stability trials, and foam volume assessments under simulated hard water conditions. Documentation includes a Product Information File and safety assessment per EU Regulation 1223/2009, and we advise on labeling for EU markets. Packaging must be leakage-resistant, often using PET bottles with compatible pumps, and production lead time is 6-8 weeks after sample approval. We support with testing protocols and compliance guidance but recommend clients verify final regulatory approval locally.